The bathroom model is DONE

| | Comments (0)
I'm officially two weeks behind, but finally this model is done. I might still have to do a wall to reflect in the mirror but I'm going to wait for that until I need it. Hopefully I've over-estimated how long it will take to texture the room or do the other models and I can make up some time over the holiday. I think I'll redo the schedule and put off texturing until later when I've read more of my mental ray book. Tomorrow, character modeling!

I'll post the models to the slideshow tomorrow when I'm awake. Unless I won't actually be awake again until Tuesday. This is going to be a 3-hour night so that's entirely possible.

room2.jpg

Leave a comment

About this Entry

This page contains a single entry by artfulmee published on June 30, 2008 2:44 AM.

Wall-e is the best movie ever made was the previous entry in this blog.

The Private Life of the Potato is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.