I love subdivision surfaces

| | Comments (0)
The toilet is done except for the hinge on the seat and the handle. (See the bathroom page.) This went really fast compared to the other models, which I've decided I will redo in subdivision surfaces now that I've reminded myself how to use them. It's a shame that this went as fast as it did and I couldn't even benefit from it because of how little time I've had to work lately. The good news is that this is a temporary situation that will be resolved shortly. And that's all I can say about that for now.

I still want the bathroom done by the end of May. That gives me five days. I doubt it will happen but I do believe the end is in sight. Maybe I'll have it by the end of next weekend. If I didn't have to work tomorrow I'd keep going tonight. But that's what my life has to be about right now: The Job. Soon enough my life will be about me again.

Leave a comment

About this Entry

This page contains a single entry by artfulmee published on May 26, 2008 10:47 PM.

Maybe it's a plumbing problem was the previous entry in this blog.

Next time I'll model a bed and crawl in is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.